Small Industrial Wind Turbines: 5 – 250 kW for Plants, Farms, Remote Sites
Small wind generators (5-250 kW) allow factories, farms and remote facilities to obtain their electricity with a stable source. Unlike large 3-5 MW turbines for industrial parks, small generators are installed individually, with simpler coordination, at their own facility. We select horizontal (HAWT) — classic, with higher efficiency in strong wind, and vertical (VAWT) — lower noise, works in turbulent wind (between buildings).
Technical parameters
- Power
- 5 – 250 kW
- Rotor type
- HAWT horizontal / VAWT vertical
- Starting speed
- 2.5 - 4 m/s
- The speed is nominal
- 10 - 14 m/s
- Mast height
- 12 - 50 m
- Warranty
- 10 - 20 years
Will I have enough wind?
You can check the map of the wind potential of Ukraine (from the UkrNDihydrometeorological Service). Profitability requires an average annual wind speed of 5+ m/s at the height of the mast. The best areas: the coast of the Black and Azov seas, the steppe regions of Zaporozhye, Kherson region, Mykolaiv region, Carpathian passes. Before investing, we order wind measurements for 6-12 months.
Connection to the network — network, island, hybrid
Grid-tied: excess electricity is sold to the grid at a green tariff (in a new format). The most profitable for a plant with night consumption. Island: all energy goes to own needs, excess in BESS. Hybrid: PV + wind + BESS + back-up connection to the grid — the most stable solution for critical facilities.
HAWT vs VAWT - what to put
HAWT (horizontal) - better efficiency in steady winds, requires 30+ m mast to exit turbulent zone. VAWT (vertical) - lower efficiency, but works in turbulent wind, quiet (important for urban planning), easier installation. For a factory with free territory - HAWT. For an object under construction — VAWT.
Frequently Asked Questions
How quickly does a small wind generator pay for itself?
Depending on the wind: 5-7 years at an average speed of 6 m/s, 8-12 years at 4-5 m/s. In an area with low wind (<4 m/s) — it is not economically profitable.
Is permission required?
Yes. Depending on the power: up to 5 kW — simple, up to 30 kW — standard, from 30 kW — full permit with EE and air defense. We help with registration.
Is it possible to serve yourself?
Basic maintenance - yes (monthly inspection, blade cleaning). Overhaul (replacement of bearings, generator) — at least with the manufacturer or a certified service.
How quickly will we put?
Small (5-15 kW) — 6-8 weeks. Medium (50-100 kW) — 12-16 weeks. Large (200+ kW) with configuration — 20-30 weeks. Installation is a separate project.