Energy Monitoring: SCADA, EMS, Controllers for PV and BESS
A solar power plant or BESS plant without monitoring is a black box. We select a system for generation control, forecasting, flow management between PV, BESS and the grid, integration with tariffs and market signals. Basic level — monitoring of each inverter, advanced — EMS with control, full — SCADA with telemechanics and integration with the system operator.

Types & Configurations
Each type is a separate range of parameters and its own task. A wrong choice here leads to overspending or downtime.
Parameters Without Which Selection Does Not Start
| Measurement accuracy | Class 0.5S — for commercial accounting, 1 — for technical, 0.2 — for reference. |
| Survey pace | 1 sec for critical telemetry, 5-15 sec for technological parameters, 1-15 min for reporting ones. |
| Protocols | Modbus RTU/TCP, IEC 61850 for substations, OPC UA for integration with ERP. |
| Integration | API for billing systems, integration with SAP, 1C, ERP of the customer. |
| Data protection | Channel encryption, authentication, action logging. It is especially important for critical objects. |
Typical Applications
What is Actually Ordered in Ukraine
FAQ
Is a separate SCADA required for a 500 kW SPP?
No. Basic monitoring of the inverter manufacturer is sufficient. SCADA is required from 5-10 MW or when there is a need for integration with the production system.
What does the EMS controller show?
Current PV generation, BESS charge, load consumption, flows to/from the network, generation forecast for the day. Controls: when to charge BESS, when to discharge, when to sell to the grid.
Is it possible to integrate with 1C / SAP?
Yes, through the EMS or SCADA API. Data on generation, consumption, and sales to the network are automatically entered into the billing system.
How much does industrial SCADA cost for a 20 MW SES?
Include the model or specifications, quantity and delivery location. We will confirm price, availability and lead time in our reply.