Water Filtration and Treatment: Mechanics, Chemistry, Membranes
We select a complete chain of water treatment according to the productivity, composition of the source water and regulatory requirements for the quality of the finished product. Not a "filter", but a technological scheme: preliminary de-ironing, softening on cationites or reverse osmosis membranes, dosing of anti-scale agents, UV disinfection, control of conductivity and pH in the flow. We work with European, Italian, Turkish and Czech manufacturers of complexes — from cartridge filters to container RO-stations of 100+ m³/h.
What does a typical water treatment plant consist of?
Water treatment technology is a sequence of nodes, each of which performs one task. Trying to "save" a node results in the next one running at the limit and failing within months.
What you need to know before the project
Water and need
| Advanced chemical analysis | Hardness, alkalinity, Fe, Mn, H₂S, Cl⁻, SO₄²⁻, NO₃⁻, NH₄⁺, oxidizability, turbidity, microbiology. |
| Target indicators | Standard: drinking (DSanPiN), technical (specific), boiler (GOST 20995), food (DSTU 7525), pharmaceutical (USP). |
| Productivity | Working and peak, m³/h. We lay down 20-30% of the reserve for regeneration / washing. |
| Mode | Permanent, cyclic, with a guaranteed reserve for continuous production. |
Engineering framework
| Available space | For a container RO — a site of 20-40 m². For an expanded complex - a room of 50-200 m². |
| Electricity | 3×400 V, power 5-150 kW depending on the performance and number of stages. |
| Drainage of the concentrate | For RO — 20-30% of productivity in drainage. Where to put the concentrate is a separate issue. |
| Management | Local controller with HMI, or PLC with interface to your SCADA via Modbus / ProfiNet. |
| Maintenance | Regular replacement of cartridges, regeneration of filters, CIP-washing of membranes. A 5-year plan with a budget. |
What for what application
| Application | Typical diagram |
|---|---|
| Drinking water of a small settlement | De-ironing + softening (if necessary) + UV + dosing of hypochlorite for preservation in the network. |
| Low pressure boiler room | Bag filter 50 μm + softener with salt tank + dosage of complex ion. |
| High-pressure steam boiler room | Pre-filtration + two-stage softener + RO + dosage of phosphates and ammonium. |
| Food industry (milk, beverages) | Pre-filtration + softening + RO + polishing filter + UV + dosing for mineralization correction. |
| Pharmaceuticals (WFI) | RO + EDI (electrodeionization) + ultrafiltration + loop circuit with UV. Validated materials (PVDF, SS316L). |
| Reverse osmosis for process water | Cartridge 5 μm + antiscale dosing + RO 8040 + clean water tank + feed pumps. |
| Irrigation with increased iron | Aeration + catalytic iron removal + 5 μm filter before droppers. Without UV. |
| Pool or SPA | Sand filter + dosing of hypochlorite and pH corrector + UV as an additional barrier. |
Typical Applications
Manufacturers working in Ukraine
The market for industrial water treatment in Ukraine is mature and saturated. European component brands — membranes DOW FILMTEC, Hydranautics, Toray is the standard for RO in the food and boiler room. Cationites and anionites — Purolite, Lanxess Lewatit, Dow Amberlite. Control valves for column regeneration — Clack, Autotrol, Fleck. UV equipment — Trojan, Wedeco (Xylem).
System integrators that assemble complexes based on these components are mainly Polish, Czech, Italian, and Israeli companies with a complete project package. Ukrainian engineering firms have strong competence in design and supervision, part of the equipment is produced locally (fiberglass tanks, stainless steel strapping). Turkish manufacturers are actively growing in the middle segment at a significantly lower price.
Material certificates are critical for tender objects (NSF / ANSI 61 for contact with drinking water, EHEDG for food, FDA / USP for pharmaceuticals). Check them before submitting the KP - without certificates you will not pass the examination.
What destroys water treatment
- Project without chemical analysis. Selection "according to passport water source" is a failure in 90% of cases. Real water always has surprises: elevated iron, sulfides, unusual organics. Analysis is mandatory before any specification.
- Savings on pre-filtration before RO. Membrane 8040 costs 500-1500 USD, replacement - 1-2 days of downtime. A 5 micron cartridge costs 30-60 USD. Saving on cartridges leads to the destruction of membranes in months instead of years.
- Lack of dosage of antiscale. The hardness of the RO concentrate is 4-5 times higher than the original. Without antiscale, carbonates and sulfates fall on the membrane — irreversible failure.
- Salt regeneration "without calculation". Overconsumption of salt by 1.5-2 times is typical. Calculating the dose based on hardness, ionite volume and duty cycle saves 30-50% of regeneration costs.
- Lack of control of conductivity and pH in the stream. Working today does not mean it will work tomorrow. Continuous monitoring of key parameters — early diagnosis of problems.
- A small tank of clean water. Reverse osmosis is a slow process. The tank is too small = constant starts / stops of the high pressure pump, accelerated wear. The standard is 30-60 minutes of buffer stock.
FAQ
Where does the project begin?
Include the model or specifications, quantity and delivery location. We will confirm price, availability and lead time in our reply.
When mechanics, when osmosis?
Mechanics — for technical water cooling, watering. Softening — with hardness >5 mmol/l. Osmosis — for high-pressure boilers, food, pharmaceutical, desalination.
How much does RO 5 m³/h cost?
Include the model or specifications, quantity and delivery location. We will confirm price, availability and lead time in our reply.
UV instead of chlorine?
For technical water — yes. For drinking in the network - no, UV does not leave a bacteriostatic effect. Standard: UV + minimal chlorine.
Are membranes occupied?
Yes, if the cost of softener regeneration (salt + brine disposal) exceeds the cost of RO-permeate, or if the quality of softened water is insufficient.
How long will the delivery take?
Softening 1-5 m³/h — 6-10 weeks. Container RO — 14-20 weeks. Large systems with full pre-cleaning — 20-32 weeks.
Inputs for an accurate equipment selection
Start with these details. Mark any unknown requirement in your enquiry so it can be clarified before a model is selected.
Check the full order code, contents, technical compliance, exclusions, documents, warranty terms and lead time in the offer. Price and availability are confirmed for your order.
Prepare an equipment enquiryThe form opens with the topic and your checklist. Nothing is sent until you submit it.