Skip to content
Equipment selection. International supply.
B2B.engineerUSK ENERGY
044 339-50-20Call us
UKTZED 8413 70 · Subgroup 04

Booster Pump Stations: Turnkey Pressure Boosting

Cascade of 2-6 pumps, hydraulic accumulator, frequency drive, control cabinet with switching logic and protections. Complete factory assembly on a common frame - arrived, connected the input / output and power cable, after 1 day it works. We select the operating point Q/H, the real consumption schedule (daily and seasonal unevenness), network pressure restrictions and the need for backup. We work with European, Italian, Turkish manufacturers.

2–500 m³/hproductivity
up to 16 barhead pressure
±0.1 baraccuracy with emergency situations
Equipment-type illustration: Booster Pump Stations: Turnkey Pressure Boosting
Four typical configurations

How to select a booster station

The architecture of the station depends on the schedule of consumption, the responsibility of the object and the budget. One universal option does not exist.

Cascade with one PE (1 master + N slave) One leading pump on a frequency drive, the rest are started by direct start in case of insufficient pressure. Simple, cheap, but uneven wear - the presenter works every day, the rest rarely. Suitable for homes with moderate unevenness. Analogs: Hydro Multi-E with 1 VFD · Lowara GHV · Wilo Comfort-N
A complete cascade with emergency situations on each (N×VFD) Each pump has its own frequency drive. The controller rotates the driving machine in relation to the uniform life of seals and motors. The highest adjustment accuracy, minimal pressure pulsation. For responsible objects. Analogues: Hydro MPC-E · GHV/E · Wilo SiBoost Smart
Fire protection (without emergency) The working pump is constantly rotating, the pressure is maintained by a hydraulic accumulator, when it falls, the main pump with a contactor is started, when it falls further, the backup (often diesel) is started. Certified implementation of EN 12845, separate test logic. Analogues: Hydro Fire · GS · Bombas Ideal
Industrial with technological integration For productions with a non-standard schedule (CIP sink, technological cycles). It works according to the command from the PLC line, keeps the set parameters. Can have a stainless strap and food seals for CIP water. Analogues: Hydro MPC-S · CRE Stainless · SiBoost Stainless
Selection parameters

What is needed for the calculation

Consumption and pressure

Estimated consumptionm³/h, taking into account the coefficient of unevenness (1.5-3 for housing, 1.2-1.5 for production).
Minimal consumptionm³/h at night or during downtime. Determines the volume of the hydraulic accumulator and the logic of stopping the leading pump.
Head pressurebar to be maintained in the network. Usually 4-6 bar for domestic supply.
Inlet pressurebar from the city network or from the tank. The difference between the head and the inlet is the real selection of pumps.
Geodetic elevationm, from the station level to the upper consumption point. Building height × 0.1 bar per floor.

Electricity and construction

Voltage3×400 V, power 1.1-22 kW per pump for typical stations. For large ones - up to 75 kW.
Type of pumpsMulti-stage vertical (CR-series, MVI, MXV) — standard. Horizontal monoblocs are less common.
Material of the flow partSS304 is the drinking water standard. SS316 — for marine or high chloride.
CollectorsHot-dip galvanized steel, stainless SS304 for responsible, SS316L for CIP with hygienic flanges.
Control cabinetIP54, with Danfoss / Schneider / ABB UPS, soft start, touch screen control panel.
Control logic

How a station with a frequency drive works

Modern booster station the pressure switch does not start or stop the pump— it keeps the pressure smoothly due to the change of revolutions. The flow pressure sensor continuously measures the actual value. The PLC in the cabinet compares it with the set point (setpoint, for example 5.0 bar) and issues a command to the frequency drive to speed up or slow down the rotation of the pump. Reaction time — 0.5-2 seconds, retention accuracy — ±0.05-0.1 bar.

When the consumption increases (in the morning, at the peak), the leading pump reaches maximum speed. If the pressure still drops, the PLC starts the second pump (on a state of emergency or with a contactor). The third, fourth — according to the same principle. When the flow drops, the pumps stop in sequence, the latter reduces the revolutions to the minimum. In the night idle mode, the pressure is maintained by the hydraulic accumulator, the pumps are completely stopped.

Alternating logic: the leading pump is changed by the number of hours or hours. This is critical for even wear — otherwise one pump has 30,000 hours, the others 200. The rotation is set up in the cabinet and done automatically.

Emergency scenarios: emergency failure — transition to direct start from the pressure switch. Pressure drop at the inlet (dry running) — stop of the station with alarm. Excess pressure on the head (jammed valve) - instant stop with an accident. Overheating of the engine (according to the temperature sensor) - stopping this pump while continuing the operation of others.

Where Delivery Works

Typical Applications

Apartment buildingsPumping from the city network for 9-25-story buildings. 3-4 pumps, pressure 4-6 bar, night mode.
Business centersStable supply to bathrooms, cafes, air conditioning. Integration with BMS, cost monitoring.
Hotels and hospitalsIncreased requirements for continuity, full redundancy, separate technical and drinking circuits.
Industrial facilitiesProcess water for production, cooling, CIP washing. Integration with PLC line.
Fire protection systemsSprinklers, hydrants. Certified implementations of EN 12845 with test run and documentation.
Irrigation and greenhousesSupply to drip systems with constant pressure, pre-filtration at the entrance.
Agrarian complexesLivestock farms, warehouses, irrigation systems. High degree of redundancy for critical water.
Pumping after tanksFrom city reservoirs to the network with insufficient self-flow pressure. Level control at the source.
Market Overview

What is Actually Ordered in Ukraine

Compare configurations by operating parameters, materials, compatibility and scope of supply. Establish purchase-price and operating-cost differences from quotations based on the same requirements.

For fire protection systems in Ukraine, the standard is certified implementation of EN 12845 with a test run once a week. This is a separate class of equipment with a reinforced frame, redundant sensors and often with a backup diesel pump. There are few manufacturers in the world that hold full certification - mostly large European brands.

Compare configurations by operating parameters, materials, compatibility and scope of supply. Establish purchase-price and operating-cost differences from quotations based on the same requirements.

Errors that we see regularly

What destroys a booster station in 6-12 months

  • An undersized hydroaccumulator without a state of emergency. Cascade ON/OFF with an 80 l tank at a 30 m³/h station — the pumps start every 30-60 seconds. Seals die in 6-9 months instead of 5-7 years. Either take the emergency vehicle on the driver, or a 300+ liter tank.
  • Lack of protection against dry running. A drop in pressure at the inlet to 0 — and the pump spins with an empty casing, overheats in 3-5 minutes. Protection is implemented by a pressure switch at the inlet or a level sensor in the tank. Necessarily.
  • One pump without reserve. If the station is critical for the house or production, the lack of a reserve is a guaranteed downtime at the first accident or service. The N+1 standard for all responsible applications.
  • Incorrect setpoint setting. Excessive pressure (for example, 7 bar instead of the required 5) — constant overspending of electricity by 20-30%, accelerated wear of seals, water hammer in the pipeline. Fine-tuning is a mandatory stage of commissioning.
  • Lack of overvoltage protection. A thunderstorm or a throw in the network destroys emergency equipment (cost 500-2500 USD per one) and engines. A surge arrester in the entrance panel costs 50-200 USD — it is paid for by the first accident.
  • Cabinet without emergency alarm. An accident happened - no one knows. It was discovered in the morning due to a complaint from residents. Simple 6-12 hours. Integration with a GSM modem or SCADA solves the problem in minutes.
Frequently Asked Questions

FAQ before ordering

How many pumps in a cascade?

Working + 1 reserve. For floors 9-16 — 3+1. For high-rise buildings and commercial buildings — 4+1 or 5+1. Less than 2 is not a station. More than 6 - difficulty > benefit.

Emergency on all or on one?

The financial benefit depends on the duty cycle, load profile and existing equipment. A comparison requires operating parameters, annual running hours and site conditions. Calculate consumption and payback for the agreed configurations.

What is the volume of the hydraulic accumulator?

With state of emergency — 24-80 l. Without state of emergency — 200-500 l at 10-30 m³/h, otherwise the pumps die within a year.

Factory assembly or on-site?

Compare a factory-built station with a custom equipment package by duty points, redundancy, dimensions, controls and maintenance access. The chosen configuration must suit the connections and site conditions.

What are the protections in the cabinet?

Current, phases, dry run, maximum pressure, surge. For engines >15 kW — thermal sensors. For fire fighters, there is a test run once a week.

How long until DAP?

Standard CR/CRE with 3-4 pumps — 6-10 weeks. Special performance — 12-16 weeks. Polish analogues from the warehouse - 2-4 weeks.

BUYER’S BRIEF

Inputs for an accurate equipment selection

Start with these details. Mark any unknown requirement in your enquiry so it can be clarified before a model is selected.

Select the information you already have

Check the full order code, contents, technical compliance, exclusions, documents, warranty terms and lead time in the offer. Price and availability are confirmed for your order.

Prepare an equipment enquiry

The form opens with the topic and your checklist. Nothing is sent until you submit it.

USK Energy

Find the right equipment

Leave your contact details. A manager will clarify the specifications and prepare a quotation.

Or contact us directly: sales@usk.ua · 044 339-50-20