Warehouse conveyor systems: rollers, belts and sorting
Select conveyor equipment for the load and the task: transport, accumulation or sorting. An enquiry needs packaging dimensions and weight, peak flow, a route layout and control requirements. Check throughput across the complete line, including curves and transfers between sections.

Choose a configuration for the task
Agree these points before ordering
| Question | What to record in the specification |
|---|---|
| Peak operating case | Agreed load mix, proportion of each load type, peak feed and test duration; not only the speed of an empty belt. |
| Curves and transfers | The smallest carrier, unstable loads, packaging overhang and gaps between sections. Samples should represent the actual packaging. |
| Buffer and restart | Required accumulation capacity, permitted contact between loads, stopping sequence and recovery after a blocked section. |
| Controls and maintenance | PLC/WMS responsibility boundaries, signal list, diagnostics, maintenance access and agreed spare parts. |
Check the actual load case
If one line carries light cartons and heavy totes, an average weight conceals two different operating cases. Supply both extremes: the shortest supporting base and the highest load. Add underside photographs to the general packaging view, and identify the centre of gravity where loads are tall or asymmetric.
Describe stops at the packing machine or dispatch area separately. A faster straight section will not remove a bottleneck at a transfer point. First establish where goods wait and how many units must be buffered; then compare conveyor configurations and drives.
AS/RS, shuttles and AGV/AMR systems can exchange loads with conveyors, but they are separate equipment classes. Record transfer height and method, ready signals, control ownership and loss-of-communication behaviour in the offer. A general promise of WMS integration does not settle these interfaces.
Questions before procurement
Should I specify roller or belt conveyors?
Assess rollers for loads with a stable supporting base. Small or unstable items may need a belt or carrier tray. Confirm the choice with the smallest and heaviest loads, including transfers between sections.
Does conveyor speed determine throughput?
Speed alone is insufficient. Load dimensions, spacing, transfer and sorting cycles, and accumulation affect output. Specify the peak flow in units or pallets per hour and agree how that operating case will be checked.
Technical references
Inputs for an accurate equipment selection
Start with these details. Mark any unknown requirement in your enquiry so it can be clarified before a model is selected.
Check the full order code, contents, technical compliance, exclusions, documents, warranty terms and lead time in the offer. Price and availability are confirmed for your order.
Prepare an equipment enquiryThe form opens with the topic and your checklist. Nothing is sent until you submit it.