Transport and Warehouse Equipment: Forklifts, Conveyors, Racks
Intralogistics of production and warehouse: loaders and stackers for processing pallets, conveyors and sorting complexes for product flows, racking systems for storage, dock systems for receiving/shipping, crane beams and hoists for artificial movement of goods. We select according to the volume of operations, warehouse height, aisle width, integration with WMS.

5 working groups for real tasks
Each group is a separate page with technical frameworks, progress positions and an RFQ checklist. Click to go to details.

Loaders and stackers
Frontal 1-10 t, reach trucks up to 12 m, stackers up to 6 m, forklifts for optimizing aisles.

Conveyors and sorting
Belt and roller, sorting systems, AS/RS, AGV/AMR-robots for warehouse and production.

Shelving systems
Pallets up to 12 m, compact drive-in, gravity roller, mobile with compact storage, mezzanine.

Docking systems
Hydraulic dock levelers 6-15 t, seals, sectional gates, mobile hydraulic platforms.

Hoists and crane beams
Electric hoists 0.5-32 t, supporting and hanging beam cranes 1-50 t, bridge cranes, gantry cranes.

AGV/AMR robotics
AGV automated carts with magnetic tape and autonomous AMR robots with SLAM navigation. Integration with WMS, ERP, MES.
Typical Industry Applications
Entering the market with warehouse equipment?
If you are a manufacturer of loaders, conveyors, racks - we close project deliveries to logistics centers, retail, and factories. Service, spare parts, supervision.
FAQ
Electric or diesel forklift?
Electric - for rooms, quiet, without exhaust, cheaper to operate. Diesel - for outdoor and off-road use, more powerful, without operating time limits.
What is the delivery time of the new loader?
Standard models from the EU - 8-12 weeks. Special execution (low temperature, with a special mast) - 16-20 weeks. Chinese - 6-8 weeks.
Is it possible to buy a used one?
Assess used equipment by its operating history, running hours, inspection results and spare-parts availability. Include refurbishment and missing components when comparing it with a new machine. Confirm condition and delivery terms for the individual unit.
Do you do a turnkey warehouse project?
Yes, with our engineering partners. Shelving + equipment + docking systems + WMS. From TK to start-up.
Inputs for an accurate equipment selection
Start with these details. Mark any unknown requirement in your enquiry so it can be clarified before a model is selected.
Check the full order code, contents, technical compliance, exclusions, documents, warranty terms and lead time in the offer. Price and availability are confirmed for your order.
Prepare an equipment enquiryThe form opens with the topic and your checklist. Nothing is sent until you submit it.