AHU air handling units, industrial fans
Basic system of quality climate in factories, offices, hospitals. We select AHUs according to air consumption, temperature range, filtration requirements, recuperation. Separate fans - for local extraction, smoke removal, fire safety. For industrial facilities with dust - filtration classes F7-F9-EPA.

Types & Configurations
Each type is a separate range of parameters and its own task. A wrong choice here leads to overspending or downtime.
Parameters Without Which Selection Does Not Start
| Air consumption | m³/h, at standard operating pressure of the installation. |
| Pressure | The Pa generated by the fan. Depends on losses in channels and filters. |
| Type of recovery | Rotary (up to 85% COP), plate (60-75% COP), with heat pump (complete). |
| Classes of filters | G3-G4 (preliminary), F7-F9 (precise), EPA, HEPA (for clean rooms). |
| Engine type | Standard AC, energy efficient EC (inverter control, 30% savings). |
Typical Applications
What is Actually Ordered in Ukraine
FAQ
What air flow is required for an office of 1000 m²?
Standard - 60 m³/h per person or 4-6 times air exchange. For 1000 m² with 80 people - 4800-6000 m³/hour.
What type of recovery to choose?
Compare configurations by operating parameters, materials, compatibility and scope of supply. Establish purchase-price and operating-cost differences from quotations based on the same requirements.
How much does a 10000 m³/h AHU cost?
Include the model or specifications, quantity and delivery location. We will confirm price, availability and lead time in our reply.
Is it possible to upgrade the old system?
The financial benefit depends on the duty cycle, load profile and existing equipment. A comparison requires operating parameters, annual running hours and site conditions. Calculate consumption and payback for the agreed configurations.
Inputs for an accurate equipment selection
Start with these details. Mark any unknown requirement in your enquiry so it can be clarified before a model is selected.
Check the full order code, contents, technical compliance, exclusions, documents, warranty terms and lead time in the offer. Price and availability are confirmed for your order.
Prepare an equipment enquiryThe form opens with the topic and your checklist. Nothing is sent until you submit it.