Industrial HVAC systems: boiler rooms, AHU, heat pumps
Heating, ventilation, air conditioning of workshops, warehouses, shopping and office centers. We select the complex for heat loads, air quality requirements, energy efficiency. Gas and pellet boilers, heat pumps for heating and domestic hot water, AHU with recuperation, local heating of workshops, dehumidification for production.

5 working groups for real tasks
Each group is a separate page with technical frameworks, progress positions and an RFQ checklist. Click to go to details.

Industrial boiler houses
Gas 50-10000 kW condensing, pellet 100-2000 kW, diesel, cast iron and steel boilers.

Heat pumps and recovery
Air-water 5-100 kW, soil-water up to 200 kW, air-air VRF up to 100 kW. COP 3-5.

AHU and fans
AHU 500-100000 m³/h with recuperation 70-85%, axial and radial fans, special smoke ATEX.

Local heating of shops
Gas heaters 30-500 kW, infrared emitters, thermal curtains over the gates.

Drying and climate control
Condensing 20-300 l/day, absorption for low temperatures, for swimming pools and saunas, mobile.

Chillers and refrigeration
Industrial chillers of 30-2000 kW of air and water cooling, with freecooling and heat utilization. For data center, food processing, production.
Typical Industry Applications
Entering the market for HVAC equipment?
If you are a manufacturer of boiler rooms, heat pumps, AHUs, air conditioners - we close project deliveries, conduct engineering consultation, and keep a stock of popular items.
FAQ
How to calculate the heat loss of the building?
According to the thermal calculation of DBN: thermal resistance of enclosing structures, calculated temperature, infiltration. The engineer will give the exact result with the recommended power.
Are heat pumps occupied in Ukraine?
Yes, especially air-water. Payback is 5-9 years, depending on the gas and electricity tariff, the type of building. For a new building - definitely profitable.
What is the type of AHU for an office?
With rotary or plate recovery, COP 70-85%. With cooling option (internal heat exchanger for chiller or DX-section).
Do you do system design?
Yes, with our design engineers. Thermal calculation, aerodynamics, equipment specification, assembly drawings.
Inputs for an accurate equipment selection
Start with these details. Mark any unknown requirement in your enquiry so it can be clarified before a model is selected.
Check the full order code, contents, technical compliance, exclusions, documents, warranty terms and lead time in the offer. Price and availability are confirmed for your order.
Prepare an equipment enquiryThe form opens with the topic and your checklist. Nothing is sent until you submit it.