International delivery of industrial equipment
Plan the shipment from dispatch to the agreed receiving point. The route depends on dimensions, weight, packaging and cargo characteristics.
Describe the cargo
Provide the number, dimensions and weight of packages, centre of gravity, lifting points and stacking restrictions. Batteries and other special cargo may have additional transport requirements.
Agree the handover point
State the Incoterms 2020 rule and the precise named place. Allocate loading, unloading, clearance, insurance and costs that are not included in the carriage contract.
Record milestones
Readiness for inspection, packing, handover to the carrier and arrival are separate events. Confirm the schedule after checking the route and equipment readiness; an estimated transit time is not a guaranteed arrival date.
Inputs for an accurate equipment selection
Start with these details. Mark any unknown requirement in your enquiry so it can be clarified before a model is selected.
Check the full order code, contents, technical compliance, exclusions, documents, warranty terms and lead time in the offer. Price and availability are confirmed for your order.
Prepare an equipment enquiryThe form opens with the topic and your checklist. Nothing is sent until you submit it.