Skip to content
Equipment selection. International supply.
B2B.engineerUSK ENERGY
044 339-50-20Call us
USK ENERGY / SUPPLY

Equipment configuration and delivery preparation

Check the contents of your order, the required documents and the receiving site. B2B.engineer focuses on equipment selection and supply.

Agree the scope of supply

List the main machine, options, sensors, cables, software licences and initial spare parts separately. Ask the supplier to identify everything that must be ordered in addition.

Prepare for receipt

Check dimensions, weight, connections, power requirements, storage conditions and service clearances against the selected model’s documentation. These details inform equipment selection and delivery planning.

Specify the documentation

Agree data sheets, manuals, drawings, conformity documents and inspection records where required. Installation, commissioning and training require a separate agreement with the contractor; they are not automatically included in equipment supply.

← Equipment procurement and delivery support