Road Rollers and Vibrate Rammers for Road and Foundation Works
Compaction is a mandatory process in road construction, airfields, foundation works, landscape design. We select single-roller rollers for soil and stone embankments, two-roller rollers for asphalt, tire rollers for airfield surfaces, manual vibratory rammers for trenches and supports. We work with European (HAMM, BOMAG, Dynapac) and Chinese (Sany, XCMG, Lonking) brands.
Technical parameters
- Type
- One-cylinder, two-cylinder, tire, combi
- Mass
- 1.5 - 25 tons
- The width of the roller
- 0.5 - 2.2 m
- Vibration frequency
- 30 – 60 Hz
- Engine
- Diesel Stage V / Tier 4
- Type of work
- Soil, asphalt, base
One-roller vs two-roller
Single roller — for soil, gravel, stone base. Two-roller — for asphalt and fine-grained coatings, where a smooth passage without traces is required. Tire - for airfield coatings and composite layers, gives good bond strength between layers.
How to choose the mass correctly
Roller mass = (layer thickness, cm) × factor. For asphalt, the coefficient is 0.8-1.2 kg per cm×m². For soil — 1.5-2.5. It is better to take the advantage with a margin - a roller of smaller mass will not compact, and a larger one will correct irregularities in one pass.
Hydrostatic drive vs mechanical
Hydrostatic — smoother ride, smooth speed control, easier restart of a stopped roller rink on a steep slope. Mechanical - cheaper, but more difficult to control on uneven surfaces. Modern skating rinks of European brands are all hydrostatic.
Frequently Asked Questions
Is it possible to use a roller instead of a vibrating plate?
On small volumes (sidewalks, sites up to 100 m²) — too expensive. Take a vibrating plate of 100-150 kg. On volumes from 500 m², the rink is more profitable in terms of productivity.
What about maintenance?
Change hydraulics every 1500 hours, engine oil every 250 hours. Roller bearings — once every 2-3 seasons. Spare parts are available in Ukraine for HAMM, BOMAG, Sany; rare items 2-4 weeks from EU.
How long does delivery take?
Serial rollers 8-13 t — 4-6 weeks from order to DAP. Large (20+ tons) and special — 8-12 weeks.
Do you rent?
We do not rent directly, but we select rental suppliers in Ukraine and do VED if you rent from the EU.