
SUPPLIER CATALOG
USK ENERGY
Energy and industrial equipment from USK. Availability and supply terms are confirmed on request.

USK ENERGY / EQUIPMENT FOR BUSINESS
Find equipment by specification, brand or part number. Compare options, agree the configuration and plan your delivery with our team.
01 / EQUIPMENT CATALOG
From a single component to a complete equipment order. Choose a category or send your specification for selection.













Equipment-category illustrations. The exact model and configuration are confirmed in the quotation.
No matches for this query. Describe the equipment, manufacturer or required specifications and send a sourcing request.

SUPPLIER CATALOG
Energy and industrial equipment from USK. Availability and supply terms are confirmed on request.
Send a part number, nameplate photo or technical specification.
Introduce your catalog to prospective buyers.
A clear sequence for your equipment purchase.
Model, part number, technical parameters or nameplate photo.
Configuration, compatibility, documents and alternatives.
Price, quantity, lead time, warranty and delivery terms.
Packaging, transport and accompanying documentation.
02 / MANUFACTURERS & SUPPLIERS
Present your products to businesses looking for production equipment. Send your catalog, specifications and terms; our team will agree publication details and how enquiries are handled.
A link to your website, PDF or equipment folder.
We review details, categories, markets and supply terms.
Prepare offers against buyers’ technical specifications.

Application for a listing. Publication follows review and your approval.
03 / PROCUREMENT TOOLS
From tender discovery to import estimates. Familiar tools connected in one procurement workflow.
Find relevant procurements, review requirements and prepare your next steps. Tender search, monitoring and analysis.
Preliminary analysis of HS codes, customs payments, documents and equipment delivery routes.
AI analysis is preliminary. Final codes, payments and requirements are verified against the shipment’s documents.
Delivery costs, customs responsibilities and the point where risk transfers.
Scroll the route left or right ↔
Select a route stage for an explanation.
When the goods are placed at the disposal of the buyer at the seller's warehouse
Domestic purchases or when the buyer has its own logistics in the seller's country and can arrange the export itself.
The foreign buyer usually cannot arrange for export in the seller's country, and the loading of the warehouse is not part of the seller's responsibilities. FCA is almost always better for export.
EXW [precise place or port] Incoterms® 2020Scroll the route left or right ↔
Select a route stage for an explanation.
The seller loads onto the buyer’s vehicle. Risk transfers after loading.
On delivery to the buyer’s carrier at the agreed place.
Containers, road and multimodal deliveries when you have your own freight forwarder. Replaces EXW for export and FOB for containers.
The exact location (address or terminal code) is not specified. If the place is the seller's warehouse, he loads the goods; if the terminal - transmits by transport without unloading. For the letter of credit, it is possible to agree on the bill of lading "on board" (Incoterms 2020 option).
FCA [precise place or port] Incoterms® 2020Scroll the route left or right ↔
Select a route stage for an explanation.
When the goods are handed to the carrier contracted by the seller. Paying for carriage to the destination does not extend the seller’s risk.
The seller has better freight rates, and the buyer insures the cargo himself.
The buyer believes that the seller is responsible for the cargo until it arrives. No: Damage in transit is the buyer's risk, so you need your own insurance.
CPT [precise place or port] Incoterms® 2020Scroll the route left or right ↔
Select a route stage for an explanation.
When the goods are handed to the carrier contracted by the seller. Paying for carriage to the destination does not extend the seller’s risk.
Expensive equipment and multimodal transportation, when the buyer needs insurance "in the price".
The currency of the policy, the deductible, the order of claims and whether the policy covers the "last mile" to your warehouse are not verified.
CIP [precise place or port] Incoterms® 2020Scroll the route left or right ↔
Select a route stage for an explanation.
At the destination, before unloading
Import of equipment "to the door", when customs clearance is done by the buyer or his broker.
Idleness of the machine while the buyer clears the cargo and no crane or loader for unloading. Specify the exact address, mode of operation and means of unloading.
DAP [precise place or port] Incoterms® 2020Scroll the route left or right ↔
Select a route stage for an explanation.
After unloading at the named place
Heavy equipment being unloaded by a supplier's assembly crew or delivered to a terminal.
The seller cannot unload on the site: there is no entrance, no crane, no permits. Write down the terms of access and responsibility for damage during unloading.
DPU [precise place or port] Incoterms® 2020Scroll the route left or right ↔
Select a route stage for an explanation.
At the destination, before unloading
Turnkey delivery from a local supplier or distributor that has a legal entity in the buyer's country.
Check whether the seller can complete import formalities in the destination country. If not, consider DAP.
DDP [precise place or port] Incoterms® 2020Scroll the route left or right ↔
Select a route stage for an explanation.
When the goods are placed near the ship's side
Bulk, large-sized and project cargoes, which are loaded by means of the ship.
Use for containers: the container is handed over to the terminal long before boarding, so the risk transition point is blurred. For containers - FCA.
FAS [precise place or port] Incoterms® 2020Scroll the route left or right ↔
Select a route stage for an explanation.
When the goods are loaded on board the ship
The buyer charters the ship himself, and the cargo is in bulk or general, without a container.
FOB for containers: the seller loses control after delivery to the terminal, but bears the risk on board. ICC expressly recommends for FCA containers.
FOB [precise place or port] Incoterms® 2020Scroll the route left or right ↔
Select a route stage for an explanation.
Early: when the goods are on board at the port of shipment, although freight has been paid to the port of destination
The seller organizes sea transportation of bulk or general cargo.
The buyer does not insure the cargo, considering that the seller is responsible for the port. For containers, CPT instead of CFR.
CFR [precise place or port] Incoterms® 2020Scroll the route left or right ↔
Select a route stage for an explanation.
When the goods are on board; then the insurance issued by the seller is valid
Sea bulk and general cargo, often with letter of credit.
Minimum ICC coverage (C) does not protect equipment from most damage. Claim in the ICC contract (A). For containers — CIP.
CIF [precise place or port] Incoterms® 2020A simplified route: agree the precise handover point and individual charges in the contract. Paying for carriage does not mean retaining risk until arrival.
All articles
Specific questions to ask before ordering equipment.

“We need a pump; please quote” starts a conversation, but leaves the supplier to choose the fluid, duty point, materials and configuration. The quotations you receive…

One quotation includes delivery, another lists only the base machine, and a third adds a year of consumables. Their totals are not yet comparable. First, make all three…

A pump is selected for a duty, not simply for the largest number in a catalog. The fluid, required flow and head, suction conditions and scope of the station must be…
04 / USK ENERGY GROUP
Find the right equipment for your factory, business or home. Explore each project to discuss specifications, configuration and supply.
USK EnergyTransformers and switchgear for power supply, backup and industrial expansion.usk.ua
USKPumps, motors, valves and components for equipment replacement and production lines.ukrsk.com.ua
BESSBattery storage and UPS equipment for critical-load backup and on-site generation.bess.com.ua
B2B.engineerCompare equipment, prepare a specification-based enquiry and find procurement opportunities on Prozorro.Explore the catalogue
SolarPromSolar panels, inverters and batteries to keep lights, connectivity and equipment running at home or work.solarprom.com.uaPRACTICAL QUESTIONS
B2B.engineer is a USK Energy platform for equipment selection, sales and supply. Explore categories and product series, prepare an enquiry and agree the configuration with our team. Suppliers can submit their catalogs.
Search by equipment type or choose a category. If you need a particular manufacturer, model or alternative, send a technical specification using the request form.
No. The form sends your catalog to the team for review. Company details, equipment, listing terms and enquiry contacts are agreed before publication.
Yes. Prozorro AI tender search and preliminary HS classification, customs and logistics analysis remain available. AI results require verification against the documents for the specific procurement or shipment.
These details are confirmed in an individual quotation after the specification, quantity, manufacturer and destination are clarified. Catalog content helps you prepare the enquiry.
YOUR NEXT STEP